NWCC New Facilities for Soccer & Softball (Rebid)

Construction of a new two-story Softball and Soccer Facility with load bearing concrete masonry with brick veneer for the first floor and load bearing masonry with wood frame with cement board siding for the second floor. The roof shall be asphalt shingles. Other areas of work include but are not limited to the following: site work, concrete work, interior concrete block and wood stud and gypsum board partitions, interior finishes (LVT, ceramic tile, etc), fire protection system, plumbing, mechanical, electrical system, and communications.

Status

Bidding Closed

Prebid Date1/7/21 1:00 pm

Bid Date1/11/21 2:00 pm

Company & Contacts

Castle Black Construction

Jonathan Logan   901.443.0151

Location

Northwest Mississippi Community College, Senatobia, Mississippi

All bids need to be turned in to Castle Black Construction on 1/11/21 at 2:00 PM
———————————————————————————————-

Pre-Bid Information

A Pre-Bid Conference will be held at the project site on the Northwest Mississippi Community College campus in Senatobia, Mississippi on Thursday, January 7, 2021 at 1:00 pm.

Bid Information

Bids will be received from Contractors at the Northwest Mississippi Community College Central, Office of Purchasing, 2nd floor McCormick Administration Building, 102 Administration Circle, Senatobia MS 38668, until 2:00 P.M., Tuesday, January 12, 2021, and then publicly opened and read aloud at McCormick Administration Building first floor Ranger Conference Room immediately following.

Scope of Work

New Construction to include but not limited to the following:

1. Construction of a new two-story Softball and Soccer Facility with load bearing concrete masonry with brick veneer for the first floor and load bearing masonry with wood frame with cement board siding for the second floor. The roof shall be asphalt shingles. Other areas of work include but are not limited to the following: site work, concrete work, interior concrete block and wood stud and gypsum board partitions, interior finishes (LVT, ceramic tile, etc), fire protection system, plumbing, mechanical, electrical system, and communications.

2. Demolition of the existing Softball and Soccer Facility once the new facility is built and accepted by the College.

B. Alternates: Alternate No. 1 provide for the lighting of the soccer field. Refer to Division 1 Section “Alternates”.

C. All accessories or incidental items not specifically shown and detailed in the specifications herein, which are necessary and/or required to complete the work within the intent of the specifications, shall be included by the Contractor without additional cost to the Owner.

Hard copy full sets of plans and specifications will be available for purchase at contractors expense, which will be fulfilled by Memphis Reprographics or files may be downloaded for free from our online plan room. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.